Showing posts with label Fête des Champignons - Corrèze en Corrèze. Show all posts
Showing posts with label Fête des Champignons - Corrèze en Corrèze. Show all posts

Sunday, 14 April 2019

Barn/8

Last time I did a full barn post there was snow on the ground and the woodburner was being lit after lunch. Now we have blossom, tiny wood violets and primroses everywhere.

Corrèze town from the garden
Progress has been on the three F's - floors, finishes and furniture. So floors first. When we bought the barn there were several (filthy) piles of chestnut parquet flooring left in the barn, precariously balanced on rotting joists. I've lost count of the times that we moved these but finally we got to use them. I spent days cleaning and sanding every tongue and groove, then made piles of the different widths and lengths for Andrew to lay. This wasn't an easy job, partly because we have a floor area of about 70 metres square but also this was old wood, not straight from the factory precision cut joints. It was difficult to work out exactly how much we had but as the piles got smaller we decided that it was touch and go that there would be quite enough so plan B kicked in - the kitchen area would be tiled.

Bottom left is how we found the wood! 
Can I say now, never volunteer to come shopping with us when we're choosing something for the house, you will never get that time back! Both trained designers we each have strong opinions, sometimes they're the same opinions but with the kitchen tiles it took six hours and several tile shops before the decision was made. Then there was the planning, we didn't want a square edge to the kitchen area but a random looking transition from the parquet.

Once the floor was laid I spent more hours on my knees sanding, and then oiling. But we're please with the result.


While I was upstairs finishing the floor Andrew had moved downstairs. We had chosen a slate effect tile for the bathrooms and hall floors, they work well with the dark shower trays and as they are external tiles they have a good grip. Once again Andrew's skill in planning shows and all three areas are looking good, and will be even better when I treat them so they have a slight sheen. He's now moved on to wall tiling (having finished the plumbing) and I'm on furniture duty.

Planning the tiles for bathroom 1 and kitchen, and a finished floor

We're very pleased with the new windows and I love the way that they open so flat and wide upstairs to take full advantage of the view. The pointed wall is too irregular for kitchen units so Andrew has built a faux wall - and it's perfect for hiding the cabling.

I still have the downstairs to decorate but there were a lot of dirty jobs happening, as well as tools and equipment about so I decided to turn my attention to furniture sourcing. Nearly all the furniture for La Grange still has to be purchased so I have been hitting Emmaus and Troc hard! I'm not a huge shabby chic fan but I do like to use paint to unite disparate items. This was a mirror I found, I really liked the shape and the fact that it was bevelled but it looked too new so it got painted and waxed. The knobs are from Maisons du Monde and as you can see from the one on the left, a bit glitzy. After some black wax they're looking much better (right).



Two 'befores' and a detail from an 'after'
So far I've painted two side tables for bedroom one, two bedside cabinets and a mirror for bedroom two. I've painted and nearly finished re-upholstering a bedroom chair, started stripping back an armchair, painted another large chair and bought a tub chair which needs a full restoration. But there is still a lot of furniture to source so I think the next few weeks will be busy. And did I say I have a mid-June deadline. Insert chewing nails icon!

Still to do!
So it looks like another busy week ahead. As always you can catch up with our progress as the barn progresses on the blog or feel free to follow us here on Facebook.





Monday, 5 November 2018

Barn/6

It's been over a month since the plasterer arrived and he finished on Tuesday - two days before the electrician. To say we've been juggling is an understatement as several elements of the conversion had to come together for the end of October, and in an order you wouldn't normally do. We moved from one task to the next and sometimes back again, I'll take you through this month's achievements.

Plastering

Our plasterer arrived and said that the plasterboarding that we'd done was fine and we were all good to go. For me plastering is the first real job on a site that makes you feel that you're on top of the hill. It was a long haul, with awkward shapes and high ceilings. As seen on nearly every Grand Designs programme it is the new windows that have been the fly in the ointment. We had a call from our suppliers to say that they were 'très compliqué' (which they're really not) and that they wouldn't be ready until January. As they wanted the window openings to be left unplastered, several of the walls have remained as such.



Stone wall

We have insulated the barn to quite a high level, all external walls and the ceiling but this has meant sacrificing some of the character. We were keen to retain the stonework in the upstairs open plan area on the wall which joins the main house (so it doesn't need insulating). As it is very dirty work we wanted to get as much of it done before plastering, and also our charming plasterer had said we could use his extra high scaffolding. All the old mortar had to be removed to a depth of about 2 centimetres, and then refilled. This is not as easy as it sounds as there are no neat lines, the mixture is quite sloppy and you're desperate for it to not all fall off the hawk. Once the mixture has been shoved  applied it has to dry for and hour or so before you go back, smooth it a bit more and then take a wire brush to remove all the mortar that is on the stone, leaving the joints. We're over halfway there, at least we can stand on the floor and work now.


Electrics

Thursday was the big day. Our electrician had agreed that Andrew could pull all the cables so that it was only the 'consumer' unit and junction boxes that needed to be connected, and of course everything checked. For the last week Andrew has been spending every spare minute (he does have a 'day job' as well) connecting sockets, switches and putting up lights. The ceiling lights meant I had to get on with some painting (hence the pointing has not been finished on the wall) as it's much easier to do this before the recessed spots go in. See what I mean? We're still pointing & plastering and yet I'm painting!

The good news was that the electrician passed all of Andrew's work and was able to connect everything up. In fact Andrew had done so much that Justin only had to spend a day with us and not the scheduled two. You have no idea what it felt like when the lights went on - a huge milestone passed.


Painting

For the past few days, and over this weekend, I will be up the scaffolding again with my trusty paint roller. On Monday the pellet stove is being installed (and it will work as we have electricity!) and I would really like to get the end wall that it will sit against painted. And as the plasterer has said I can hold on to the tower a little longer I'm taking advantage of it to paint the 4 metre plus ceilings. Plus I'd like to get them done before we put the floor down.



Although we have no more trades booked in, and so technically no deadlines, we still have a lot to do. We need to give some thought to the two bathrooms, although planned I need to source the fittings and tiles. Flooring has to be sourced for downstairs and I can start to think about furniture - I have my spreadsheet with requirements and sizes that now goes everywhere with me.

In case you were getting bored with building site photographs, we found this spot out on a recent walk, as usual Mortimer headed straight for the water.

The Corrèze river



Wednesday, 17 October 2018

Fête des Champignons - Corrèze en Corrèze

We all know that most of France has an obsession with mushrooms and Corrèze is no exception. For the last couple of weeks signs for the mushroom fair had been appearing, posters, wooden cut outs and window displays. We even had the programme delivered to us by hand, we were not being allowed to let this spectacle go unnoticed.

Mushrooms appeared all round town
This year is the 20th anniversary of the fête and was organised by Corrèze Animation. We had been watching the weather forecast with a degree of nervousness, rain was predicted for the whole day and the temperature was dropping by ten degrees from the highs of the previous week. Now we desperately need the rain (as do the mushrooms) but we were keeping everything crossed that it would stay dry for the day's events. And I can confirm that mass finger-crossing works, it was windy but sunny and 20 degrees.

I will confess that for a day devoted to mushrooms there was a distinct lack of fungi! But it has been so dry that they have been severely reduced in numbers. There were a couple of stands selling them, giant cepes and some strange spongy ones stood out. I had a chat with the lady from 'la confrérie mycogastronomique gaillardaise' ( this national association was formed to promote any activity related to wild or cultivated mushrooms and we had representatives from Brive) who was kind enough to tell us about the fungi they had on display, which were good to eat and how to cook them. I will say now that I am not going to go round the woods picking and feasting, reputable sellers only for me.


The fête had a definite autumnal feel to it, there were sales of local apples, walnuts and sweet chestnuts. I finally found the perfect small basket (I'd been looking for ages) to do the morning croissant run with, and watched the man making them. It was quickly put to use to carry some 'beignets aux pommes' home which we enjoyed with friends. There were various bands and the fun went on for most of the day.


It was a lovely day, the fête well supported by villagers and visitors and congratulations to Corrèze Animation for their organisation.

Featured Post

Sweet was the walk along the narrow lane...

 is the opening line of William Wordworth's poem about walking and it's so relevant to our region of Corrèze. When we bought the hou...